PDB 124

Construction Project
Stabling station Untertürkheim Baustufe 2 - PFA 1.6b - Los 1
Location
  • Untertürkheim
Client
  • DB Netz AG
Planning
  • DB Netz AG
Investment volume
  • approx. EUR 400.0 million
Construction Period
  • 2022 to 2024
Contracted services BMG
  • Senior construction supervision STE
  • Technical coordination STE
  • Construction supervision of railway catenary installations  (BÜB OLA)
  • Construction supervision of railway electrical power installations (BÜB 50 Hz)
  • Railway related operational services and safety monitoring compliant with VV BAU and VV BAU-STE of the German Federal Railway Authority (EBA)
Completed constructions
  • The new stabling station replaces the previous stabling station at Rosensteinpark
  • There will be 33 stabling tracks with a total length of L = 8.5 km
  • Construction of an outdoor cleaning system
    • Preset track (L = 400.00 m)
    • Washbay area (L /B/H = 128.00/8.00/8.60 m)
    • Drip track with drip tray (L = 30.00 m)
  • Construction of an operating building
    • The operating building serves to accommodate the operating stand of the wash control   system
    • Inclusion of cleaning agent storage, poqwe supply and measurement and control technology
  • Construction of an interior cleaning system
    • The interior cleaning system consists of a platform (L/W = 400.00/14.00 m)
    • It is used for refilling fresh water, disposal of waste water, maintenance, repairs
  • Construction of a technical building
    • The technical building (L/W = 45.00/11.50 m) is operationally connected with the interior   cleaning system
    • The technical building includes storage rooms for operating materials and social rooms for   the staff
    • Offices for the local administration
Special features
  • The location of the stabling station is largely determined by the concept of a ring traffic system
Utilization
  • The operational advantage is that trains terminating in and departing from Stuttgart can be routed through the maintenance and stabling station and back to the through station without changing direction.