Construction Project
New construction S-Bahn Stuttgart - PFA 1.7 - Superstructure and 50 Hz
Location
  • Stuttgart
Client
  • DB Netz AG
Planning
  • DB Netz AG
Investment volume
  • -
Construction Period
  • 2022 to 2024
Contracted services BMG
  • Senior construction supervision STE
  • Technical coordination STE
  • Construction supervision of railway superstructure and structural engineering (BÜB Ob/KIB)
  • Construction supervision of railway electrical power installations (BÜB 50 Hz)
Completed constructions
  • Starting in Stuttgart North, construction of a new S-Bahn line
  • Continuation to the new station Mittnachstrasse
  • Connection to the S-Bahn main line via new track connections in the north ramp from Stuttgart low station
  • Construction work to be carried out
    • Heavy mass-spring system (SMFS) in Tunnel (L = 390.00 m)
    • Light mass-spring system (LMFS) as ballasted track on soft sub-ballast mats (L = 490 m)
    • Ballasted track 4805 (L = 3,200.00 m)
    • Ballasted track 4716 (L = 3,200.00 m)
    • Longitudinal drainage in tunnel areas and benches
    • Electrical power installations 50 Hz
    • Installation of power supply points in tunnel tubes as fire and disaster protection according to    the Directive of the Federal Railway Authority (EBA)
    • Installation of tunnel safety lighting (TSB)
    • Ventilation and deaeration of the technical rooms
    • Service room doors, fire barriers, handrail, escape route marking, tunnel emergency call   according to the Directive of the Federal Railway Authority (EBA)
    • Installation of lifting units
    • Construction of telecommunication systems inside the tunnels
    • Construction of a point heating station
Special features
  • Vibration engineering studies on behalf of the state capital Stuttgart
  • Prognosis of immissions (vibrations) on a development with high-quality building use
Utilization
  • In the area of the new underground Stuttgart main station, the S-Bahn running openly in the track apron is to be relocated to underground guidance in the tunnel