PDB 127

Construction Project
Renewal of railway signal box (ESTW) Burghausen with extension of Wacker plant
Location
  • Burghausen
Client
  • DB Netz AG
Planning
  • DB Netz AG
Investment volume
  • -
Construction Period
  • 2022 to 2023
Contracted services BMG
  • Construction supervision of railway superstructure and structural engineering (BÜB Ob/KIB)
  • Construction supervision of railway catenary installations  (BÜB OLA)
  • Construction supervision of railway electrical power installations (BÜB 50 Hz)
  • Construction supervision of railway control and safety technology (BÜB LST)
  • Railway related operational services and safety monitoring compliant with VV BAU and VV BAU-STE of the German Federal Railway Authority (EBA)
Completed constructions
  • Retrofitting of the Burghausen railway signal box (ESTW) in the existing railway signal box building A (ESTW building A)
  • Extension of the rebuilt ESTW building A to include the Burghausen Wacker plant station section
  • Signal foundations – making the signal foundations as pile-driving foundations
  • Work on the exterior facilities
    • Cable laying work for railway control and safety technology and 50 Hz
    • Assembly work for railway control and safety technology equipment (Siemens)
    • New construction of point heating systems for all points
    • Cable pulling work for track 5725
  • Commissioning of ESTW-Z-Mühldord for control of Mühldorf control center
  • Dismantling of the old system in the station section Burghausen Wacker plant including power supply
Special features
  • Investments in innovative technology allow the train driver to set 34 points only by himself and to do it without the dispatcher
Utilization
  • The measure is intended to contribute to greater acceptance of rail as an environmentally friendly mode of transport
  • This is achieved through a fluid operating sequence and thus reduced noise and exhaust emissions