PDB 130

Construction Project
Wendlingen Airport Lot D - PFA 1.4 – non - ballasted track
Location
  • Stuttgart
Client
  • DB Netz AG
Planning
  • DB Netz AG
Investment volume
  • -
Construction Period
  • 2024 to 2025
Contracted services BMG
  • Construction supervision of superstructure and structural engineering (BÜB Ob/ KIB)
  • Welding Supervision QÜS
  • Basement, ground floor, 1st to 2nd floor, top floor
Completed constructions
  • Lot D is a section of the Stuttgart-Wendlingen new railway line and includes
  • PFA 1.4 - BA D1 - Filder Plain
  • PFA 1.4 - BA D2 - Filder Plain to Wendlingen
  • Construction services for non-ballasted track
  • approx. 3.7 km track in trough or tunnel
  • approx. 15.2 km track on open line
  • 20 points, design 60-1,200-1:18.5
  • approx. 0.2 km light mass-spring system
Special features
  • All required planning approvals have been obtained
Utilization
  • Improvement of the Stuttgart-Ulm-Augsburg railway line with a 2-track extension