Construction Project
Wendlingen Airport Lot D - PFA 1.4 – non - ballasted track |
Location
|
Client
|
Planning
|
Investment volume
|
Construction Period
|
Contracted services BMG
- Construction supervision of superstructure and structural engineering (BÜB Ob/ KIB)
- Welding Supervision QÜS
- Basement, ground floor, 1st to 2nd floor, top floor
|
Completed constructions
- Lot D is a section of the Stuttgart-Wendlingen new railway line and includes
- PFA 1.4 - BA D1 - Filder Plain
- PFA 1.4 - BA D2 - Filder Plain to Wendlingen
- Construction services for non-ballasted track
- approx. 3.7 km track in trough or tunnel
- approx. 15.2 km track on open line
- 20 points, design 60-1,200-1:18.5
- approx. 0.2 km light mass-spring system
|
Special features
- All required planning approvals have been obtained
|
Utilization
- Improvement of the Stuttgart-Ulm-Augsburg railway line with a 2-track extension
|