Construction Project
Multiple Unit Train Facility Berlin-Rummelsburg |
Location
|
Client
- DB Projekt GmbH Knoten Berlin
|
Planning
- DE-Consult, Haas-Consult, Arge TzA Berlin-Rummelsburg, Siemens AG, ARCOR Mannesmann Berlin
|
Investment volume
|
Construction period
- February 1997 to December 1998
|
Contracted services for BMG
- Overall project management
- Partial project management
- Local contract management
- Coordination of the construction supervision
|
Structures constructed
- Streets and paths
- Tracks, Bridges structures
- Multiple train unit facility with underground wheelset facility
- Wheelset diagnostic facility, Outside cleaning facility
- Electronic railway control centre, light signal technology
- Telephone systems
- Treatment facility, operational building with warehouse, social and catering areas
|
Special features
- Large-area disposal or immobilization of contaminated soil
- Weapon location and removal on an area of about 5 km²
|
Utilization
- Central ICE railway operational facility for Berlin
|
Construction
- Tracks with frost-proof roadbed
- Cable troughs and ducts made of pre-fabricated parts
- Steel construction for signal and traction current technology
- Reinforced concrete skeleton construction, site-mixed, concrete construction, masonry construction
|
Design/Fixtures
- Aluminium suspended façades, concrete pre-fabricated parts, plastered façades
- Flat and saddleback roof constructions
- Control of all operational control functions by computer (Ethernet)
- Offices and social rooms for more than 200 employees constantly at the facility
|