PDB 100

Construction Project
Railway Project Stuttgart 21- Commissioning of the first loop line 226 at station Feuerbach
Location
  • Stuttgart - District Feuerbach
Client
  • DB Netz AG
Planning
  • SSF lngenieure AG München
Investment volume
  • approx. EUR 10.0 million
Construction period
  • 2014 to 2015
Contracted services BMG
  • Construction project management
  • Interface coordination
Completed constructions
  • New construction of first loop line axis 226 with
    • Construction of track trough 226
    • New pedestrian subway as partial construction, located underneath track trough 226
    • Single-track railway bridge across Borsigstraße for construction section 1 (L = 20.00 m)
    • Construction of retaining wall 1 (L = 95.00 m)
    • Pedestrian subway (W/L/H = 6.00/54.00/2.80 m), positioned below the trough structure
Special features
  • Extremely limited space for construction site equipment
  • Construction activity while maintaining the operation of existing intercity and S-Bahn tracks
  • Relocating existing intercity railway line to the outside next to the trough structure
  • This creates open space for the trough construction
  • Trough construction intersects existing foot paths
  • Replacing the subway between platforms with new Platform 2 including staircase
  • Construction of two single-track railway bridges across Borsigstraße for loop lines
  • Precursory demolition of existing double-tracked railway bridge
  • Extensive partial and complete road closure with detours
  • Comprehensive traffic phase planning for footpaths and traffic lanes at the Borsigstraße railway crossing
  • Preservation of the heritage-protected retaining wall
Utilization
  • Railway feed line Feuerbach to Stuttgart main train station