BMG GmbH & Co. KG - Keithstrasse 2-4 - D-10787 Berlin | Tel: +49 (0)30 2100220

PDB 103

Construction Project
Expansion track Nurnberg-Ebensfeld - Construction section Erlangen km 16.84 to km 24.05
Location
  • Erlangen/Ebensfeld
Client
  • DB Netz AG
Planning
  • OBERMAYER Planen & Beraten GmbH
Investment volume
  • approx. EUR 78.5 million
Construction period
  • 2013 to 2017
Contracted services BMG
  • Claim management
  • Project site management
  • Construction supervision of superstructure and structural engineering (BUB Ob/KIB)
  • Railway related operational services and safety monitoring compliant with VV BAU and VV BAU-STE of the EBA
Completed constructions
  • Expansion of railway line from 2 to 4 tracks
  • Retaining walls made of bored piles for the protecting cuts in the terrain (n = 200 units)
  • Key RC/FO = Railway crossing/flyover
  • RC km 16.84 Grundlachbach (L = 19.00 m)
  • FO km 17.43 Kreisstraße 5 (L = 17.50 m)
  • RC km 17.77 across 5-Bahn/freight train tracks (L = 80.00 m)
  • FO km 18.32 across Hutgraben (L = 2.40 m)
  • RC km 18.43 Flurstraße (L = 5.00 m)
  • RC km 18.65 Weinstraße (L = 13.50 m)
  • RC km 19.03 Pestalozzistraße (L = 4.80 m)
  • RC km 19.35 across BAB 3 (circular rod with solid plate; L = 108.50 m)
  • FO km 20.23 Tennenloher Straße (L = 23.30 m)
  • RC km 20.62 pedestrian and bicycle subway at train station Bruck (L = 6.60 m)
  • FO km 20.90 Felix-Klein-Straße (L = 32.00 m)
  • FO km 21.62 Paul-Gossen-Straße (L = 41.80 m)
Special features
  • Designed for intercity train speed (VE= 160 to 230 km/h)
  • Designed for 5-Bahn (commuter train) speed (VE= 140 to 160 km/h)
  • New construction of island platform, staircase, shelter and lift system at train station Erlangen-Eltersdorf
  • New construction of island platform, staircase, shelter and lift system at train station Erlangen-Bruck
  • New construction of island platform, staircase, shelter and lift system at main train station Erlangen
  • New construction of island platform, staircase, shelter and lift system at train station Erlangen Paul-Gossen Street
Utilization
  • Important section on the expansion and new construction of the Nurnberg-Erfurt­ Leipzig/Halle-Berlin track
  • This reduces the travel time from Munich to Berlin to approx. 4 hours