BMG GmbH & Co. KG - Keithstrasse 2-4 - D-10787 Berlin | Tel: +49 (0)30 2100220

PDB 107

Construction Project
ABS Berlin - Dresden Continuation of the 1st building stage
Location
  • Berlin, Zossen, Baruth, Elsterwerda, Großenhain, Dresden
Client
  • DB Netz AG
Planning
  • WKP Planungsb[ro fur Bauwesen GmbH VBI
Investment volume
  • approx. EUR 163.0 million
Construction period
  • 2014 to 2018
Contracted services for BMG
  • Technical Audit
Completed constructions
  • Level crossing measures
    • 2 railway bridges (EU)
    • 13 road bridges (50)
    • 2 x alternative route construction
  • Civil engineering
    • 2 passenger tunnel in the Barth and Altgollßen Stations
    • 2 footbridges in the Klasdorf and Drahnsdorf Stations
    • 18 culverts
    • 2 signal bridges in the area of Luckau-Uckro Station
  • Superstructure and catenary installations
    • Track replacements (L = 62 km)
    • Switch installation (n = 24 pieces)
    • Replacement of catenary installation (L = 93 km)
  • Stations
    • New building of 4 stations in Baruth, Klasdorf, Drahnsdorf and Walddrehna
    • Extension and replacement of the existing platforms in the Ruckersdorf and Gollßen stations
  • Control and safety technology
    • New building of 6 Electronic Signal Boxes (ESTWA-A)
    • Computer-aided remote control of all the signals and points from the Berlin Main Line Operating Centre
Special features
  • Extensive immission protection
  • Use of mobile sound insulation walls to reduce the building noise
  • Water protection by avoiding building-related pollution
  • Soil protection by proper intermediate storage and re-use of top soils
Utilization
  • Improvement of offered quality by reducing travel time
  • Achievement of a target travel time from Berlin Central Station to Dresden Central Station of 80 minutes.