PDB 108

Construction Project
Rail project Stuttgart 21- Project Section Albvorland Wendlingen-Kirchheim PFA 2.la/b
Location
  • Wendlingen am Neckar, Kirchheim unter Treck
Client
  • DB Netz AG
Planning
  • Miscellaneous
Investment volume
  • approx. EUR 412 million
Construction period
  • 2015 to 2022
Contracted services for BMG
  • Contract management
  • Follow-up management
Completed constructions
  • Railway bridge (EU) Neckar Valley, 3-field continuous bearing structure (L = 135.50 m)
  • Railway bridge (EU) Neckar Valley Railway, 3-field continuous bearing structure (L = 58.55 m)
  • Short Wendlinger Curve (KWK)
    • Tunnel using mining techniques (L = 383.50 m)
    • Tunnel in the North using open technique (L = 55.50 m)
    • Tunnel in the South using open technique (L = 55.20 m)
    • Trough structure in the North (L = 145.20 m)
  • Goods train connection (GZA)
    • GZA-BAB tunnel using mining techniques under A8 (L = 173.00 m)
    • GZA-NBS tunnel using mining techniques for connection to the newly built line (L = 170.70 m)
    • Trough structure in the North (L = 51.50 m)
  • West Portal Area
    • Connecting structure of the GZA tunnel to the northern tube of the GZA-NBS on the newly built line
    • Sonic-Boom structure in open technique (L = 5.00 m)
    • Overlapped bore pile wall as sealing wall (L = 445.00 m)
    • Sheet pile wall as sealing wall (L = 362.00 m)
  • Albvorland Tunnel (L = 2 x 8.176 m)
    • Machine driving by means of two hard stone -EPB shield driving machines
    • Designed in 2 tubes with 16 connecting structures
    • Outside shield diameter (D = 10.82 m)
    • Elevation of the northern tube in parts in shotcrete technique (L = 380.00 m)
    • Covering (Umin./ Umax. = approx. 65.00 m /approx. 10.00 m)
Special features
  • Extensive measures to avoid building and operational immissions
  • Extensive evidence preservation measures
  • Extensive animal conservation measures for kingfishers, skylarks, partridges, sand lizards, etc.
Utilization
  • Incorporation of the newly built line (NBS) Wendlingen-Ulm in Ulm Central Station
  • Wendlinger Curve connects the newly built line to the existing line of the Neckar Valley Railway
  • Connection of the newly built line (NBS) to the existing line of the single-track goods train
  • Express connection from Stuttgart to Ulm is part of the "Magistrale for Europe"