Construction Project
Sewage Treatment Plant Dortmund, intake structures |
Location
|
Client
|
Planning
- Emscher-Lippe Verband, Essen
|
Investment volume
|
Construction period
|
Contracted services for BMG
- Section 55.8 HOAI-Property planning for engineering structures and traffic facilities, general construction management
- Section 57 HOAI-Local construction supervision
|
Structures constructed
- Intake structure Kirchderner Graben
- Intake structure Rüschebrinkgraben
Intake structure Körnebach
|
Special features
- Construction of all intake structures under running water
|
Utilization
- Integration of the open foul water collection basin in the overall concept of the new construction of the sewage treatment plant Dortmund-Scharnhorst
|
Construction
- Reinforced concrete troughs in exposed concrete
- Above-water surfaces with scour protection made of sheet pile walls
- Underwater surfaces covered with rubble masonry
|
Design/Fixtures
- Intake structures integrated into the semi-natural trench profile
- Steel construction for hydraulic engineering in the form of weir gates operated hydraulically
|