Construction Project
Sewage Treatment Plant Dortmund, Manufature of reinforced concrete lines
Location
  • Dortmund-Scharnhorst
Client
  • Emscher-Lippe Verband
Planning
  • Emscher-Lippe Verband, Essen
Investment volume
  • approx. DM 1.6 million
Construction period
  • May 1995 to July 1995
Contracted services for BMG
  • Section 55.8 HOAI-Property planning for engineering structures and traffic facilities, general construction management
  • Section 57 HOAI-Local construction supervision
Structures constructed
  • Outflow ducts
  • Inflow ducts
  • Flood protection dams
  • Reinforced concrete lines internal diameter 1600-2600 mm
Special features
  • Observance of flood protection measures
  • Depth of the pipelines 6.0-12.5 m under top ground surface
Utilization
  • Connection of the part components of the sewage treatment plant into a functioning unit
Construction
  • Ducts made of reinforced concrete impervious to water
  • Pipe K-FM or K-GM
  • Duct connection as articulated design