BMG GmbH & Co. KG - Keithstrasse 2-4 - D-10787 Berlin | Tel: +49 (0)30 2100220

PDB 35

Construction Project
Repair Citadines Apart Hotel-Covent Garden
Location
  • London-Westminster
Client
  • Citadines Apart Hotel
Planning
  • Andreas Neudahm Objekt Design GmbH, Wuppertal
Investment volume
  • approx. EUR 7.6 million
Construction period
  • February 2002 to June 2002
Contracted services for BMG
  • Section 15.3, 15.5–8 HOAI-Property planning of buildings and outdoor installations, preliminary draft, execution planning, allocation and property supervision
  • Section 73.5–8 HOAI–Property planning of technical installations, execution planning, allocation and property supervision
Lot area
  • 1,750 m2
Footprint
  • 1,450 m2
Gross floor space
  • 16,675 m2
Gross volume
  • 56,115 m3
Storeys
  • 2 basements, 1st to 8th floors
Utilization
  • Boarding house
Construction
  • Masonry structure with historical façade
  • Ceilings in parallel arches
Design/Fixtures
  • Refurbishment of the complete building technology (heating, ventilation, sanitary facilities and electricity and fire protection technology)
  • General overhaul of the lifts
  • Sealing of the ceiling surfaces
  • Drying of the basement rooms
  • Appointment of the rooms in 4-star standard