BMG GmbH & Co. KG - Keithstrasse 2-4 - D-10787 Berlin | Tel: +49 (0)30 2100220

PDB 45

Construction Project
BMW Car Factory Leipzig-Utilities Centre South
Location
  • Industrial Park Leipzig-North
Client
  • BMW AG
Planning
  • ARGE overall planning with the participation of IFB Dr. Braschel AG and WPW Ingenieure, Leipzig
Investment volume
  • approx. EUR 16.0 million
Construction period
  • November 2002 to September 2003
Contracted services for BMG
  • Section 15.8–9 HOAI–Property planning for buildings
  • Section 57 HOAI–Local construction supervision
  • Construction site logistics
Lot area
  • 2,000,000 m2
Footprint
  • 28,000 m2
Gross floor space
  • 29,000 m2
Gross volume
  • 336,000 m3
Storeys
  • 1 to 2 storeys
Utilization
  • Delivery of engines, transmissions, seats and interior roof Social rooms
Construction
  • Steel supports with grid connectors, steel supports in single foundations, about 110, grid 18.75 m
Design/Fixtures
  • Outside façade insulated sheet metal
  • Flat roof
  • Conveyor belts with belt overhead construction
  • Driverless transport system