Construction Project
Dresden Railway, Section Südkreuz-Blankenfelde |
Location
|
Client
- DB Projekt GmbH Knoten Berlin
|
Planning
|
Investment volume
|
Construction Period
|
Contracted services for BMG
- Contract management
- Subsequent work management
- Cost steering
|
Structures constructed
- Reconstruction and electrification of the section (L = 14.2 km) from Blankenfelde to intersection with Anhalt Railway Station south of the railway station Papestrasse
- Expansion into a two-track section
- Construction and repair of fourteen railway overpasses
- Construction of one road overpass
- Construction of five pedestrian subways
- Construction at freight railway station Marienfelde, S-Bahn station Marienfelde, S-Bahn station Lichtenrade, S-Bahn and regional railway station Blankenfelde
|
Special features
- In the area of the Berlin railway outer ring, design of a connection curve to the terminal at the new airport Berlin-Brandenburg
|
Utilization
- Rejuvenation of the traditional southern approach to Berlin
- Direct connection of the terminal of the airport Berlin-Brandenburg to the Central Station Berlin/Lehrter Railway Station
- Expansion of railway station Blankenburg as connection station between S-Bahn and regional railway
|
Construction
- Expansion based on state-of-the-art railway construction and safety technology
- Planned speed within Berlin 160 km/h and outside of Berlin 200 km/h
|