Construction Project
Railway Project Stuttgart 21- Site clearance Main Station Stuttgart-Interface coordination in the area of switches and crossings |
Location
|
Client
|
Planning
|
Investment volume
|
Construction period
|
Contracted services for BMG:
- Construction supervision of superstructure and structural engineering (BOB Ob/KIB)
- Construction supervision by Bahn Leit- und Sicherungstechnik (FBO LST)
- Railway related operational services and safety monitoring compliant with VV BAU and VV BAU-STE of the EBA
- Construction management
- Interface coordination
- Deadline monitoring
- Supervision railway
|
Lot area
|
Utilization:
- Creating site clearance for the new construction of the later low-level railway station
- Clearing building site and alteration of the area of switches and crossings
- Tracks and platforms in the railway terminus will be shifted 120m North-East
- Structural alteration works of the area of switches and crossings comprises 61 different
- building stages
- After completing the work in the area of switches and crossings the actual construction of the new lower-level through-station can be started
- Reducing the annoyances for passengers through night and weekend work
|
Construction
- Extending and connecting platforms to the network
- Extending the roof
- Rail-technical adaptations in the sectors of signalling equipment, catenary and railway tracks
- Removal of existing track (L = 10,000 m)
- New track construction (L = 5,300 m)
- Removal of existing points (n = 92 pieces)
- New point construction (n = 50 pieces)
- New construction of platform including alterations and new construction
- Platform roof (A= 5,500 m2)
- New construction of signalling special constructions (n = 63 pieces)
- Extensive cable laying work
- New construction of points heating and train pre-heating systems (n = 97 pieces)
|