BMG GmbH & Co. KG - Keithstrasse 2-4 - D-10787 Berlin | Tel: +49 (0)30 2100220

PDB 86

Construction Project
Railway Project Stuttgart 21 - Technical building of Main Station Stuttgart
Location
  • Stuttgart
Client
  • DB Netz AG
Planning
  • ingenhoven architects, Düsseldorf
Investment volume
  • approx. EUR 25.0 million
Construction period
  • 2013 to 2015
Contracted services BMG
  • Project management
  • Construction management
  • Contract management
Plot area
  • 2,000 m2
Gross area
  • 3,200 m2
Storeys
  • Level 0 to Level -1
Utilization
  • Supplying the underground station and parts of the Bonatz building with
    • Medium high voltage 10 kV, 50 Hz
    • Low voltage 400 V, 50 Hz
    • Heating, ventilation and air conditioning
    • Fire extinguishing water
Construction
  • Reinforced concrete
Design/equipment
  • District heating transfer stations (n = 2 x 1.5 MW)
  • Recirculation air cooling unit for the internal cooling of electrical systems
  • Pump stations (Q = 3,000 L/min) for the supply of fire extinguishing water
  • Fire extinguishing water {V = 50 m3 )
  • Medium high voltage for general and safety voltage supply network (n = 5 units)
  • Transformers with a total output of 5 MW (n = 5 units)
  • 400 V low voltage distribution units with outputs of 630 A to 1,250 A (n = 6 units)
  • Lighting system (n = 250 lights)
  • Safety lighting system (n = 170 lights)
  • Fire alarm systems (n = 280 fire detectors)
  • Smoke extractor systems
  • Intrusion detection system
  • Cables/wires for telecommunication and EDV (n = 100 sockets)
  • Interior and exterior lightning protection system