Construction Project
Passau Main Train Station - Barrier-free expansion |
Location
|
Client
|
Planning
|
Investment volume
|
Construction period
|
Contracted services BMG
- Construction supervision of superstructure and structural engineering {BUB Ob/KIB)
- Railway related operational services and safety monitoring compliant with VV BAU and VV BAU-STE of the EBA
|
Completed constructions
- Construction phase 1 - 3
- Expansion and entry into service of the eastern part of platform C
- Expansion and entry into service of the eastern part of platform C
- Expansion of platform roof, public address system and platform pedestrian subway as access to platform C
- Construction phase 4
- New construction of platform C East
- Construction of platform pedestrian subway, phase 2
- Completion of staircase accesses to platform in front of station building and Platform C
- Entry into service of platform C East
- Construction phase 5
- New construction of platform C West
- Continuation of subway between platforms
- Entry into service of platform B East
- Construction phase 6
- New construction of platform B East with platform roof from the start of the platform to the eastern train protection signals
- Completion of the subway between platforms
- Entry into service of platform B East
- Construction phase 7
- Demolition of subway between platforms
- Completion of roofs and platform surface in front of the station building
|
Special features
- Elimination of platform track 6a
- Shortening the eastern platform track Sa by L = 80.00 m
- Raising the station building platform by H = 55 cm over a length of L = 300.00 m
- Raising the island platform by H = 76 cm over a length of L = 400.00 m
|
Utilization
- Train station is stopping point for ICE and IC trains of the DB AG and OBB commuter traffic
- ICE trains arrive every two hours from Vienna via Linz to Frankfurt and continue to Dortmund
|