Construction Project
New railway track Erfurt-Eisenach - Road support system and equipment 200 km/h |
Location
|
Client
|
Planning
|
Investment volume
|
Construction period
|
Contracted services BMG
- Construction supervision of superstructure and structural engineering (BUB Ob/KIB)
- Construction supervision by Bahn Leit- und Sicherungstechnik (FBU LST)
- Railway related operational services and safety monitoring compliant with VV BAU and VV BAU-STE of the EBA
- Betra (German operation and construction) application as construction site management planer
- Schedule control
- Planning control
- Contract management
- Cost control
|
Completed constructions
- Length of track (L = 54.00 km)
- Design speed (VE = 140 to 200 km/h)
- Removal of all railway crossings in Schonau
- Construction of a bridge for motor traffic
- Construction of a pedestrian tunnel
- New construction of access and installation of 2 lifts in the Frottstadt train station
- Adjustment of stations at Wutha, Mechterstadt and Sattelstadt
- Rehabilitation and rework of 2 bridges in order to increase structural stability
- Revising signal systems and overhead lines
- Replacing the roadbed and track at a length of L = 28.00 km
- Replacing rail tracks and installing 30 new points
- Work continues during regular train traffic
|
Special features
- Project is a tangent measure to the overall project VDE 8
- Installation of train control system ETCS (European Train Control System) and the GSM-R (Global System for Mobile Communications-Railway)
|
Utilization
- Erfurt as an important hub of the expansion and new construction of the Nurnberg-Erfurt Leipzig/Halle-Berlin track
- Hourly connection to fast long distance lines
- Subsequent track connections benefit from time gained by the expansion and new construction
|