Construction Project
New railway track Erfurt-Eisenach - Road support system and equipment 200 km/h
Location
  • Erfurt/Eisenach
Client
  • DB Netz AG
Planning
  • DB ProjektBau
Investment volume
  • approx. EUR 95.0 million
Construction period
  • 2014 to 2019
Contracted services BMG
  • Construction supervision of superstructure and structural engineering (BUB Ob/KIB)
  • Construction supervision by Bahn Leit- und Sicherungstechnik (FBU LST)
  • Railway related operational services and safety monitoring compliant with VV BAU and VV BAU-STE of the EBA
  • Betra (German operation and construction) application as construction site management planer
  • Schedule control
  • Planning control
  • Contract management
  • Cost control
Completed constructions
  • Length of track (L = 54.00 km)
  • Design speed (VE = 140 to 200 km/h)
  • Removal of all railway crossings in Schonau
  • Construction of a bridge for motor traffic
  • Construction of a pedestrian tunnel
  • New construction of access and installation of 2 lifts in the Frottstadt train station
  • Adjustment of stations at Wutha, Mechterstadt and Sattelstadt
  • Rehabilitation and rework of 2 bridges in order to increase structural stability
  • Revising signal systems and overhead lines
  • Replacing the roadbed and track at a length of L = 28.00 km
  • Replacing rail tracks and installing 30 new points
  • Work continues during regular train traffic
Special features
  • Project is a tangent measure to the overall project VDE 8
  • Installation of train control system ETCS (European Train Control System) and the GSM-R (Global System for Mobile Communications-Railway)
Utilization
  • Erfurt as an important hub of the expansion and new construction of the Nurnberg-Erfurt­ Leipzig/Halle-Berlin track
  • Hourly connection to fast long distance lines
  • Subsequent track connections benefit from time gained by the expansion and new construction