BMG GmbH & Co. KG - Keithstrasse 2-4 - D-10787 Berlin | Tel: +49 (0)30 2100220

PDB 18

Construction Project
Eugen-Roth-Straße Sport Facilities
Location
  • Berlin-Marzahn
Bauherr
  • ELT Arge Landsberger Tor
Planning
  • A - D Dévény and Partner architect’s office, Gummersbach
Investment volume
  • approx. DM 2.5 million
Construction period
  • August 1998 to May 1999
Contracted services for BMG
  • Overall project management
  • Section 15.7-9 HOAI-Property planning for buildings and outdoor installations, placing, property supervision and documentation
  • Section 73.7-9 HOAI-Planning of technical property equipment, placing, property supervision and documentation
Lot area
  • 20,418 m²
Footprint
  • 830 m²
Gross floor space
  • 830 m²
Gross volume
  • 4,996 m³
Storeys
  • 1 to 2 storeys
Utilization
  • Single gymnasium
Construction
  • Reinforced concrete or truss construction made of steel and reinforced concrete with MW infill
  • Functional sports building with reinforced concrete ceiling with gravel cover
  • Sports hall in glued-laminated timber construction
  • Galvanized sheet cover of shed roofs with gravel cover
Design/Fixtures
  • Outside: Heat insulation plaster
  • Inside: Gypsum plaster
  • Floor covering: Modular double swing floor
  • Electric and sanitary systems: Standard equipment