Construction Project
Securing of a Listed Shear Wall |
Location
|
Client
- GBI-Gesellschaft für Beteiligungen und Immobilienprojektentwicklung mbH & Co. KG
|
Planning
- GKK & Partner, Architects, Berlin
|
Investment volume
- approx. EUR 0.240 million
|
Construction period
|
Contracted services for BMG
- Construction consulting for the technical performance of the interception
- Cost analysis of the interception measures
- Supervision of the technical performance
|
Lot area
|
Construction floor space
|
Gross floor space
|
Gross volume
|
Storeys
- Basement, ground floor, 1st to 4th floors, attic storey
|
Utilization
|
Construction
- Load removal over four GEWI posts, post diameter 50 mm, column diameter 200 mm, reinforcement with outside steel pipe to composite section
- Application of the shear wall (700 kN) on IPE 600 as cross-beam
- Construction of a reinforced concrete frame as top beam on the GEWI posts
- Placement and wedging of the steel beams on the reinforced concrete frame
- Demolition of the old foundations
- Construction of the invert as concrete impervious to water and underpinning of the shear wall
- Removal of the auxiliary construction
|
Design/Fixtures
- Securing and preservation of the historical shear wall of the Siemens headquarters
- Integration of the masonry wall in the new construction of the building as a construction monument
|