PDB 47

Construction Project
BMW Car Factory Leipzig, Energy Depot
Location
  • Industrial Park Leipzig-North
Client
  • BMW AG
Planning
  • ARGE overall planning with the participation of IFB Dr. Braschel AG and WPW Ingenieure, Leipzig
Investment volume
  • approx. EUR 34.0 million
Construction period
  • December 2002 to September 2003
Contracted services for BMG
  • Section 15.8-9 HOAI-Property planning for buildings
  • Section 57 HOAI-Local construction supervision
  • Construction site logistics
Lot area
  • 2,000,000 m²
Footprint
  • 2,300 m²
Gross floor space
  • 4,600 m²
Gross volume
  • 38,500 m³
Storeys
  • 1 to 2 storeys
Utilization
  • BMW car factory energy depot; supply of power, heat, cooling and pressed air to production sites
Construction
  • Construction involving material combination: 2-storeys in skeleton construction, 1-storey in steel hall construction; roof in trapezoidal sheet metal on steel purlins
Design/Fixtures
  • Outside façade as insulated coffered steel wall, inside walls as plasterboard partition walls, floor covered with linoleum and industry laminate