Contracted services BMG
- Construction supervision services
- Construction supervision of media channels in the trough structure
- Construction supervision of fire protection, north side
- Construction supervision of cable pull extension
- Coordination of expert assessment for the South Head-North Head Hall
- Condition assessment of the project Gebhard-Müller-Platz
- Preparation of the commissioning dossier
- Condition assessment of the station hall
- Delivery of track bed to Lot B
- Support of the overall documentation for the sealing
- Construction supervision of South Head mould remediation
- Construction supervision of measuring, control and regulation technology (MCR)
- Construction supervision of the expansion of the railway equipment, 50 Hz
- Construction supervision of the smoke removal structure, surge control structure, South Head
- Construction supervision of the cable routes, main hall
- Construction supervision of the extinguishing water pipeline, Filder tunnel
- Construction supervision of the emergency vehicle access lane, North Head
- Construction supervision of the sprinkler line, trough wall cavity, track 1
|