BMG GmbH & Co. KG - Keithstrasse 2-4 - D-10787 Berlin | Tel: +49 (0)30 2100220

PDB 131

Construction Project
Stuttgart underground railway station - Various subprojects
Location
  • Stuttgart
Client
  • DB Netz AG
Planning
  • DB Netz AG
Investment volume
  • -
Construction Period
  • 2022 to 2024
Contracted services BMG
  • Construction supervision services
  • Construction supervision of media channels in the trough structure
  • Construction supervision of fire protection, north side
  • Construction supervision of cable pull extension
  • Coordination of expert assessment for the South Head-North Head Hall
  • Condition assessment of the project Gebhard-Müller-Platz
  • Preparation of the commissioning dossier
  • Condition assessment of the station hall
  • Delivery of track bed to Lot B
  • Support of the overall documentation for the sealing
  • Construction supervision of South Head mould remediation
  • Construction supervision of measuring, control and regulation technology (MCR)
  • Construction supervision of the expansion of the railway equipment, 50 Hz
  • Construction supervision of the smoke removal structure, surge control structure, South Head
  • Construction supervision of the cable routes, main hall
  • Construction supervision of the extinguishing water pipeline, Filder tunnel
  • Construction supervision of the emergency vehicle access lane, North Head
  • Construction supervision of the sprinkler line, trough wall cavity, track 1
Completed constructions
  • Subprojects in Stuttgart underground railway station
Special features
  • -
Utilization
  • -