PDB 104

Construction Project
Halle Junction - Electronic signal box with rail plan modification
Location
  • Halle (Saale)
Client
  • DB Netz AG
Planning
  • DB ProjektBau GmbH
Investment volume
  • approx. EUR 500.0 million
Construction period
  • 2014 to 2019
Contracted services for BMG
  • Betra application as a constructional application process according to Ril 406
Completed constructions
  • Length of construction section 9 km
  • Track laying (L = 50 km)
  • Switches (n = ca. 200 pieces)
  • Intersection structure, distance 6350, km 1,807 (L = 86 m)
  • New construction/refurbishment, engineering structures (n = 9 pieces)
  • Retaining wall, track 318 (L = 72 m)
  • Retaining wall on the railway bridge (EU) Birkhahnweg (L = 172 m)
  • Reconstruction of the railway signal box sub-centre - (ESTW) Halle Hbf (Ost)
  • Extension of the railway signal box sub-centre (ESTW) Halle Hbf (West)
  • New construction of a sectioning point
  • New construction of two transformer stations
  • New construction of two remote control systems
  • Adaptation of platforms as a result of the modification of the rail plan.
Special features
  • Modification of the rail plan dividing it into several constructional sections
  • Adaptation of civil engineering, drainage, catenary and switch heating systems
  • Implementation of active and passive sound insulation measures and the provision of compensatory measures
  • Design speed (VE= 80/100 to 160 km/h)
Utilization
  • Halle Junction is an important hub in the rail network of Deutsche Bahn:
    • Dresden-Leipzig-Halle-Magdeburg-Hannover/Schwerin
    • Berlin-Halle-Munich/Frankfurt Main
    • Cottbus-FaIkenberg-Halle-Sangershausen-Kassel
    • Start of the section after Sandersleben-Halberstadt