Construction Project
Project Development Hotel Opernpassage Hamburg |
Location
|
Client
- Landmarks Beteiligungsverwaltung-Gesellschaft mbH & Co. Opernpassage Hamburg KG
|
Planning
- Sembritzki, Tran Viet and Grossmann, Hamburg
|
Investment volume
- approx. EUR 120.0 million
|
Construction period
- April 2005 to November 2007
|
Contracted services for BMG
- Project development
- Construction consulting, planning and cost optimization, cost estimates and calculation
- Section 15.5–9 HOAI–Execution planning, property planning for the buildings and outdoor installations, allocation, property supervision and documentation
- Section 73.7–9 HOAI–Property planning for technical installations, allocation, property supervision and documentation
|
Lot area
|
Construction floor space
|
Gross floor space
|
Gross volume
|
Storeys
- 3rd to 1st underground level, ground floor, 1st to 7th floors, staggered storeys
|
Utilization
- Mixed utilization: hotel, retail, office, wellness, cinema, underground car-park
|
Construction
- Excavation pit in subterranean curtain construction with grouted anchor
- Invert sealing with low-lying high-pressure injection invert
- Underground levels in concrete impervious to water
- Upper storeys in steel concrete partition construction
|
Design/Fixtures
- Design hotel of the upper category as 4-star-plus hotel
- Cultivated department store with high standard of fittings
- Reconstruction of the listed cinema “Metropolis”
- 12 office units with state-of-the-art communications technology
|