Construction Project
Municipal Train Duisburg, Construction Phase TA6-Los 23 and 24 |
Location
|
Client
|
Planning
- Metropolitan Railway Construction Office of the City of Duisburg
|
Investment volume
|
Construction time
|
Activities
- Construction management
- Contract management
- Technical coordination
|
Structures constructed
- Two-track tunnel rectangular cross-section in open construction (L = 312 m)
- Operating rooms
- Pedestrian distribution levels
- Ramp (L = 260 m) to an above-ground reversing and parking facility in dig-and-cast construction method
|
Special features
- Extensive work moving lines
- Groundwater compensation using a groundwater siphon
- Excavation of ramp under protection of subterraneous curtains and below the reinforced concrete cover placed over it
|
Utilization
- Metropolitan railway tunnel of the City of Duisburg
|
Construction
- Excavation pit created from braced or rear-anchored walls
- Watertightness of the excavation pit by integration of the subterraneous curtains in tertiary layers
- Design of the tunnel inner shell out of concrete impervious to water in the station area using invert-wall-ceiling construction
- Creation of ramp area out of subterraneous curtains with force-lock joining of reinforced concrete ceilings and inverts
|
Geology
- Two groundwater storeys with seasonal fluctuations between 4.0 and 8.5 m
- Fills, clay, gravel, sand, fine sand, potter’s clay
- Chalk silt without sand inclusions respectively with sand strips and sand layers
- Rock of the carbon
|